FL
26 de dez de 2016
The Course is very interesting and helpful from all prospective. I'm the project Owner and it was great experience for better understanding of the scheduling, different techniques and Lean Delivery.
GV
9 de set de 2020
It was excellent an platform for e-learning and i free courses are tailored in an excellent manner where one can feel that students are not taken for a ride because it covers in a big way.
por Juan P C
•16 de out de 2017
Great introductory course for non civil engineers or architects that want to get involved in the industry
por Donavan E
•10 de out de 2019
I feel that the softewares used in this industry was not presented properly. the visual aids were poor
por Ram j
•16 de mai de 2020
Informative. I would recommend taking the course to understand the basics of construction scheduling.
por Erich S
•20 de jul de 2020
I like the calculations. The Lean guy, Sam Spata covers too much too fast during his lectures.
por Kalamba B
•3 de jul de 2020
like this course, but much deeper learning would be more welcome on certain topics. thank you
por Elodie T
•3 de mai de 2020
Complete courses, but pity that some of the projection like software modules are bad quality.
por joshua w
•13 de mai de 2017
Very informative and helps to look at other not traditional scheduling methods.
por Wiadita D A
•4 de mai de 2021
The risk allocation and planning section is a bit difficult to understand.
por Diego A
•13 de mai de 2020
The first three weeks of the course are way too basic and slow to develop.
por Michelle W
•17 de mar de 2021
I wish it wasn't "about" scheduling, but instead actually had scheduling.
por Zhanar B
•10 de fev de 2017
I like the course for its clear structure and straightforward content.
por Detorrie T
•5 de abr de 2018
This was a fast-paced and intense course brimming with great content.
por Aleksandra A
•4 de dez de 2020
I expected to see more examples of real-life construction projects.
por Kevin S
•7 de jun de 2020
Great intro to construction scheduling, from project flow to tech.
por amr e
•22 de out de 2017
good course with a great experience as a beginner in scheduling.
por Hanna E
•3 de out de 2017
Good information, but some errors in one of the quizzes.
por Evangelos K
•13 de mai de 2021
Great refresher from college course. Highly recommend.
por Jorge J L
•6 de mai de 2017
Great course, very thorough, rigorous and engaging.
por José P
•10 de out de 2020
An exciting new way of scheduling construction.
por Durgesh K S
•2 de out de 2018
I got alot of knowledge..... about scheduling.
por Alfonso P
•25 de fev de 2018
Prof. Odeh is very good. Worth watching!
por Bishwajit B
•8 de set de 2019
The Lean methods are best articulated.
por a1
•18 de ago de 2019
I liked the course, it is very useful
por Darisa S R
•14 de ago de 2020
Pretty good, but very basic concepts
por justin v
•31 de dez de 2018
just take good notes and you'll pass