FL
26 de dez de 2016
The Course is very interesting and helpful from all prospective. I'm the project Owner and it was great experience for better understanding of the scheduling, different techniques and Lean Delivery.
T
10 de abr de 2022
Excellent course with details. The Instructors are well equiped and has a lot of experience on the Industry. The only problem that i see is they didn't share the reading materials and ppt.
por Het S
•23 de mai de 2020
Insightful
por Alexander M R S
•17 de mai de 2020
EXECELENTE
por Juan C T
•14 de mai de 2020
EXCELLENT!
por Luis M P A
•3 de jan de 2017
Excellent!
por SEGU V N K
•28 de fev de 2022
VERY GOOD
por ABDUL I S
•29 de nov de 2021
Excellent
por Rajiv M
•30 de abr de 2020
Fantastic
por Bățăgui L S
•18 de abr de 2020
Very good
por Luis E C D
•31 de ago de 2017
Wonderful
por Emma W
•17 de ago de 2017
very good
por Deepak M
•22 de jun de 2017
excellent
por Fariborz B
•25 de out de 2021
Perfect
por Efraim J R B O
•4 de out de 2020
Great!!
por MAZAREDO , C D (
•26 de fev de 2021
none
por FAHAD A K
•22 de jun de 2020
Best
por Andres Z
•15 de jun de 2017
Good
por Joven C
•24 de mai de 2017
gOOD
por Filippos F
•30 de nov de 2019
A+
por Ara
•26 de fev de 2021
T
por shanmuga r
•29 de dez de 2019
The Excercise problems were good.The instructor has put lot of efforts to develop and organize the course content.The technology applications were very informative.it could have been still more beneficial if we were given assignments to solve in that particular softwares in online platform.An option is needed to download the ppts.
por Faisal W K
•12 de nov de 2020
Its really great to learn basics of scheduling. All the lectures were informative. Specially Scheduling lectures from Dr. Ibrahim and my favourite is Miss Dareen Salama, she always introduces innovative new technologies which is the future of Planning and Scheduling
por Canada E M
•14 de ago de 2022
G​reat Course. I had some problems in the module "Linear Construction and Line of Balance" dealing with all the formulas and calculations. Maybe, a supporting printed material could be available as an option for the learners.
por Kayeye M J
•11 de mai de 2021
I am so thankful that I was able first to find this course here and it has help me to improve my knowledge on project scheduling and what type of modernist or method is beneficial for construction project management
por kumar s k
•23 de set de 2020
It would be more helpful if we get explained about the schedule of a Real-world project or any the industry experts worked on from start to end.
Everything is good but the primavera modules are little clumsy.
por cks.pll@gmail.com
•26 de nov de 2016
The course is very helful in understanding the various concept of scheduling. The course material gives to the poibt views and examples to understand tbe concept and very nicely delivered.