Understanding Work Days and Calendar Days

Loading...
Visualizar o programa do curso

Habilidades que você aprenderá

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Avaliações

4.8 (848 classificações)
  • 5 stars
    677 ratings
  • 4 stars
    155 ratings
  • 3 stars
    11 ratings
  • 2 stars
    3 ratings
  • 1 star
    2 ratings
AY

Aug 11, 2018

Amazing course! I've learned a lot from Dr. Odeh and all the stuff are very skilled and have a lot of knowledge. Thank you so much for such a great Course.

EJ

Apr 20, 2019

I am challenging myself in ways I did not know was possible. This course, so far, has been inspirational for me both personally and professionally.

Na lição
Understanding Work Dates and Calendar Dates
In this module, the difference between working dates and calendar dates is explained and how to chart both in a project plan.

Ministrado por

  • Ibrahim Odeh, Ph.D., MBA

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Explore nosso catálogo

Registre-se gratuitamente e obtenha recomendações, atualizações e ofertas personalizadas.