Understanding Work Days and Calendar Days

video-placeholder
Loading...
Visualizar o programa do curso

Habilidades que você aprenderá

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Avaliações

4.8 (1,495 classificações)
  • 5 stars
    79.53%
  • 4 stars
    17.92%
  • 3 stars
    2%
  • 2 stars
    0.33%
  • 1 star
    0.20%
VT
23 de Dez de 2019

This course was beneficial. Each topic was taught in a simple, understandable way, and you may not have any difficulty with the basics. I enjoyed it a lot, and I think this could help you.

LF
13 de Mai de 2020

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

Na lição
Understanding Work Dates and Calendar Dates
In this module, the difference between working dates and calendar dates is explained and how to chart both in a project plan.

Ministrado por

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University

Explore nosso catálogo

Registre-se gratuitamente e obtenha recomendações, atualizações e ofertas personalizadas.