The Role of the Scheduler in Construction Projects

video-placeholder
Loading...
Visualizar o programa do curso

Habilidades que você aprenderá

Schedule, Linear Scheduling Method, Program Evaluation And Review Technique (PERT), Critical Path Method

Avaliações

4.8 (1,609 classificações)

  • 5 stars
    79,80%
  • 4 stars
    17,77%
  • 3 stars
    1,92%
  • 2 stars
    0,31%
  • 1 star
    0,18%

VT

23 de Dez de 2019

Filled StarFilled StarFilled StarFilled StarFilled Star

This course was beneficial. Each topic was taught in a simple, understandable way, and you may not have any difficulty with the basics. I enjoyed it a lot, and I think this could help you.

LF

13 de Mai de 2020

Filled StarFilled StarFilled StarFilled StarFilled Star

Sufficient detail (rather than broad concepts) with active, practical learning aspects to it. Easy to navigate and dip in & out as you reference other materials to assist with learning.

Na lição

The Role of the Scheduler in Construction Management

Jennifer Buermann, of the STV Group, discusses the role of the scheduler in a construction project and how to determine if a project is on track to meet the estimated goals. Also covered are ways to adjust to ensure the project stays on track.

Ministrado por

  • Placeholder

    Ibrahim Odeh, Ph.D., MBA

    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University