Lean: Time and Schedule

Loading...
Do curso por Universidade Columbia
Construction Scheduling
469 ratings
Universidade Columbia
469 ratings
Curso 2 de 4 em Specialization Construction Management
Na lição
Lean Design in Construction Scheduling
Sam Spata, of MethodLean, discusses lean design and lean scheduling. The concept of Flow is introduced, the process of how to get from the beginning to the end of a project, as a measurable addition of value.

Conheça os instrutores

  • Ibrahim Odeh, Ph.D., MBA
    Ibrahim Odeh, Ph.D., MBA
    Instructor, Department of Civil Engineering and Engineering Mechanics, Columbia University
    Director of Research and Founder, Global Leaders in Construction Management

Explore nosso catálogo

Registre-se gratuitamente e obtenha recomendações, atualizações e ofertas personalizadas.